E-MAIL FOR SPONSORSHIP

GERC Grants 465-Day Extension for 100 MW Wind-Solar Hybrid Power Project

The Commission condoned the delay in setting up power evacuation infrastructure

thumbnail

Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights


The Gujarat Electricity Regulatory Commission (GERC) has granted a 465-day extension to set up an evacuation line along with bays and a metering system for a 100 MW wind-solar hybrid power project in Gujarat.

⭐ This is a premium article. Subscribe to access exclusive content.

Subscribe to Continue Reading

Get unlimited access to premium articles, in-depth analysis, and exclusive content from Mercom India.

Unlimited premium article access
Exclusive market insights
Premium research reports
Ad-free reading experience
Loading subscription plans...

RELATED POSTS

Get the most relevant India solar and clean energy news.

RECENT POSTS