E-MAIL FOR SPONSORSHIP

Madhya Pradesh Lowers Rooftop Solar Tender Capacity from 25 MW to 15 MW, Removes DCR Clause

The deadline for the submission of bids is June 16, 2020

thumbnail

Follow Mercom India on WhatsApp for exclusive updates on clean energy news and insights


The Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) has reduced the capacity of its earlier tender floated for the installation of 25 MW of grid-connected and off-grid rooftop solar projects. The capacity has now been cut down to 15 MW. Another modification in the tender is the removal of the domestic content requirement.

⭐ This is a premium article. Subscribe to access exclusive content.

Subscribe to Continue Reading

Get unlimited access to premium articles, in-depth analysis, and exclusive content from Mercom India.

Unlimited premium article access
Exclusive market insights
Premium research reports
Ad-free reading experience
Loading subscription plans...

RELATED POSTS

Get the most relevant India solar and clean energy news.

RECENT POSTS