Tender Auction
The Gujarat Electricity Regulatory Commission (GERC) has invited bids from consultancy firms to assist in finalizing the Grid-Interactive Battery Energy Storage System...
NLC India (NLCIL) has issued an engineering, procurement, and construction (EPC) tender for setting up a 250 MW/500 MWh battery energy storage system (BESS) project at...
NTPC Renewable Energy (NTPC REL) has invited bids for the engineering, procurement, and construction (EPC) of a 250 MW solar project with a 50 MW/200 MWh battery energy...
Gujarat Urja Vikas Nigam (GUVNL) has invited bids to set up 335 MW/670 MWh of standalone battery energy storage systems (BESS) in Gujarat (Phase VIII). Bids must be...
Solar Energy Corporation of India (SECI) has issued a request for selection (RfS) for developers to set up 1,000 MW/8,000 MWh of pumped-storage projects (PSP) for “on...
The Solar Energy Corporation of India (SECI) has invited bids from renewable energy developers to supply 1,000 MW of excess power (FDRE-VIII) from projects with existing...
The Telangana Power Generation Corporation (TGGENCO) has floated a tender to procure 2,000 MW of energy storage capacity from pumped hydro storage projects under a...
Energy storage in India was long viewed as a niche and costly solution, with limited deployment until around 2018. High costs, immature technologies, and regulatory...
December 23, 2025
/
Parth Shukla
/
Energy Storage,
Market & Policy,
Mercom Research Focus,
Tenders & AuctionsBulgaria’s Ministry of Energy has approved funding for 31 energy storage system (ESS) projects totaling 4 GWh, worth BGN 228.9 million (~$137.29 million), under its...
The Solar Energy Corporation of India (SECI) has issued a request for selection to set up six standalone battery energy storage system (BESS) projects in Odisha, with a...
Power Grid Corporation of India (POWERGRID) has invited bids to select a pre-bid partner to set up standalone 250 MW/500 MWh battery energy storage system (BESS) in...
SJVN has floated a tender to set up 2,000 MW of energy storage capacity from pumped storage projects (PSPs) across India. The storage capacity will have eight hours of...
The Energy and Resources Institute (TERI) has issued two tenders to set up 12.5 MW/25 MWh and 43 MW/86 MWh battery energy storage systems (BESS) at the 33/11 kV Shivalik...
Mahanadi Coalfields (MCL), a subsidiary of Coal India, has invited expressions of interest (EoI) to set up a 60 MWh battery energy storage system (BESS) project in...
NTPC has floated an engineering, procurement, and construction (EPC) tender to set up 2,670 MWh of battery energy storage systems (BESS) at nine of its thermal power...
1
2
3
...
21